Create a custom utilization graph

To create a custom graph that combines two utilization metrics that are not typically combined in a standard utilization graph:

Procedure
  1. From the main menu, select the resource utilization you are interested in, and then click the control to expand the Custom utilization graph.
  2. Select the two metrics that you want to graph.
  3. The metrics available depend on the resource you are viewing.
  4. The following sample graph shows the metrics available for enclosure utilization statistics. See Custom utilization metrics for more information.
  5. On the custom graph, drag your pointer across the time period you want to view.

NOTE:

If the metrics you select use different units of measurement, the units for the first metric are displayed on the left side of the graph, and the units for the second metric are displayed on the right side of the graph.

See also