Power off a server
Prerequisites
- Privileges: Infrastructure administrator, Server administrator, or Server firmware operator
The enclosure or rack manager, and the hardware are successfully added and are managed by the HPE OneView appliance.
Procedure
NOTE:
Powering off a server can take several minutes. A confirmation message is displayed once the server is powered off.