Installing a hot-plug SAS or SATA drive

WARNING: To reduce the risk of injury from electric shock, do not install more than one drive carrier at a time.

The server can support up to 24 drives in an LFF configuration and up to 48 drives in an SFF configuration.

To install the component:

Procedure

  1. Do one of the following:
  2. Remove the drive blank.
  3. Prepare the drive.
    Preparing the drive
  4. Install the drive.
    Installing a drive
  5. Determine the status of the drive from the drive LED definitions.
  6. Do one of the following:

Results

To configure arrays, see the HPE Smart Storage Administrator User Guide on the Hewlett Packard Enterprise website.