In this section Powering up the server Power down the server Remove the server from the rack Extend the server from the rack Remove the access panel Install the access panel Remove the SPI board Install the SPI board Processor memory drawer shipping screw locations Remove the processor memory drawer Install the processor memory drawer Remove the processor memory drawer cover Install the processor memory drawer cover Access the Systems Insight Display |