Software Management

Management features

Maintaining the Brocade 16Gb FC Switch Module

Interpreting LED activity

LED patterns

POST and boot specifications

About the reset button

Replacing a faulty Brocade 16Gb FC Switch Module

Powering on and off

The Brocade 16Gb FC Switch Module power is provided by the frame. The Brocade 16Gb FC Switch Module runs POST by default each time power to the enclosure is turned on. The POST process can last up to three minutes.

To remove power from the switch, use OneView or remove the Brocade 16Gb FC Switch Module from the frame interconnect bay.


NOTE: Each time the Brocade 16Gb FC Switch Module is powered on, its settings are restored to the last saved configuration.