Installing the product in the rack
To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately stabilized before installing the chassis.
To reduce the risk of personal injury or equipment damage, do one the following:
If the chassis is empty, use at least 2 people to lift and stabilize the product pieces during assembly.
If the chassis is fully loaded, use at least 4 people to lift and stabilize the product pieces during assembly.
Use a lift that can handle the load of the product.
Be sure to keep the product parallel to the floor when installing the chassis. Tilting the product up or down could result in damage to the slides.
On both sides, align the three alignment pins on the chassis with the channel in the rails. Otherwise, the chassiscan fall if the rack is moved or shipped.