CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top.
Procedure
-
Unpack the system and remove all components from the
chassis.
-
Install the
chassis and cable management arm into the rack. For more information, see the installation instructions that ship with the selected rail system.
-
Install options in the
chassis.
-
Install all components in their original locations in the
chassis.
-
Connect the power cords to the rear of the
chassis.
-
Connect the system to the power source.
WARNING: To reduce the risk of electric shock or damage to the equipment:
- Do not disable the power cord grounding plug. The grounding plug is an important safety feature.
- Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all times.
- Unplug the power cord from the power supply to disconnect power to the equipment.
- Do not route the power cord where it can be walked on or pinched by items placed against it. Pay particular attention to the plug, electrical outlet, and the point where the cord extends from the
server.