Remove the server from the rack

Prerequisites
WARNING: This server is heavy. To reduce the risk of personal injury or damage to the equipment:
  • Observe local occupational health and safety requirements and guidelines for manual material handling.
  • Get help to lift and stabilize the product during installation or removal, especially when the product is not fastened to the rails. Hewlett Packard Enterprise recommends that a minimum of two people are required for all rack server installations. A third person may be required to help align the server if the server is installed higher than chest level.
  • Use caution when installing the server in or removing the server from the rack; it is unstable when not fastened to the rails.
To remove the server from a Hewlett Packard Enterprise, Compaq-branded, Telco, or a third-party enclosure:

Procedure

  1. Power down the server .
  2. Remove all power:
    1. Disconnect each power cord from the power source.
    2. Disconnect each power cord from the server.
  3. Disconnect all peripheral cables from the server.
  4. Remove the server from the rack.

    For instructions on how to extend or remove the server from the rack, see the documentation that ships with the rack rail system.

  5. Place the server on a sturdy, level surface.