Installing the FlexibleLOM
Procedure
- Power down the server blade.
- Remove the server blade.
- Place the server blade on a flat, level work surface.
- Remove the access panel.
- Remove the mezzanine assembly.
-
Install the FlexibleLOM.
- Install the mezzanine assembly.
- Install the access panel.
- Install the server blade.
- Power up the server blade.