Device bay thermal requirements

Operate the chassis only when a device or blank is installed in all device bays. Before powering up the chassis, be sure to do the following:

  • Install a drive or drive blank into all drive bays.
  • Install a server or a blank into all server bays.
  • Install a power supply or power supply blank into all power supply bays.