Prepare the server for operation
Procedure
-
If removed, attach the security padlock and/or the Kensington security lock.
For more information, see the lock documentation.
- Connect all peripheral cables to the server.
- Connect the power cord to the server power jack, and then to the AC source.
- Secure the power cord and rear panel cables based on the standard cable management practices.
- Power up the server.