Procedure
-
Power down the
server (Power down the server).
-
Remove all power:
- Disconnect each power cord from the power source.
- Disconnect each power cord from the
server.
-
Do one of the following:
-
Remove the access panel (Remove the access panel).
-
Remove the air baffle (Removing the air baffle).
-
Remove the air baffle diverters.
-
Install the air baffle.
-
Release the full-length expansion board retainer.
To replace the component, reverse the removal procedure.