Installing an energy pack
Procedure
- If installed, remove the front bezel.
- Power down the server.
-
Remove all power:
- Disconnect each power cord from the power source.
- Disconnect each power cord from the server.
- Disconnect all peripheral cables from the server.
- Remove the server from the rack.
- Remove the access panel.
-
Install the energy pack.
CAUTION:
To prevent improper airflow that can lead to thermal damage, make sure to secure the energy pack cable in the metal tab as shown in the cabling illustration.
- Connect the energy pack cable.
- Connect the storage controller backup power cable.
- Install the access panel.
- Install the server into the rack.
- Connect all peripheral cables to the server.
-
Connect the power cords:
- Connect each power cord to the server.
- Connect each power cord to the power source.
- Power up the server.
- If removed, install the front bezel.
The installation is complete.