Installing an LFF hot-plug drive

CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated with either a component or a blank.
Procedure
  1. If installed, remove the front bezel.
  2. Remove the drive blank.

    Removing an LFF drive blank
  3. Prepare the drive.

    Preparing an LFF drive for installation
  4. Install the drive.

    Installing an LFF drive
  5. If removed, install the front bezel.
  6. Determine the status of the drive from the drive LED definitions.

The installation is complete.

To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise website.