Preparing the server for operation
Procedure
- Install any options or cables previously removed to access the TPM connector.
- Install the access panel.
-
Do one of the following:
Slide or install the server into the rack.
Install the server into the server.
-
Power up the
server.
- Connect the power cords (rack and tower servers).
- Press the Power On/Standby button.