Preparation procedures Power down the server Extending the server from the rack Removing the server from the rack Installing the server into the rack Releasing the cable management arm Removing the access panel Installing the access panel Removing the bezel Removing a riser cage Removing the optical drive cage from the LFF chassis Removing the optical drive cage from the SFF chassis Installing the bezel and the bezel lock Power up the server Enable the enhanced cooling function