IMPORTANT: When the
server is in standby mode, auxiliary power is still being provided to the system.
Prerequisites
Before powering down the
server for any upgrade or maintenance procedures, perform a backup of critical server data and programs.
Procedure
-
Remove the bezel.
-
To power down the server, use one of the following methods.
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the
server enters standby mode.
Press and hold the Power On/Standby button for more than 4 seconds to force the
server to enter standby mode.
This method forces the
server to enter standby mode without properly exiting applications and the OS. If an application stops responding, you can use this method to force a shutdown.
Use a virtual power button selection through
iLO.
This method initiates a controlled remote shutdown of applications and the OS before the
server enters standby mode.
-
Verify that the
server is in standby mode by observing that the system power LED is amber.