Installing the server into the rack
To install the server into a rack with square, round, or threaded holes, see the instructions that ship with the rack hardware kit.
Observe local occupational health and safety requirements and guidelines for manual material handling.
Get help to lift and stabilize the product during installation or removal, especially when the product is not fastened to the rails. Hewlett Packard Enterprise recommends that a minimum of two people are required for all rack server installations. A third person may be required to help align the server if the server is installed higher than chest level.
Use caution when installing the server in or removing the server from the rack; it is unstable when not fastened to the rails.