Installing the tower-to-rack conversion kit

Use the tower-to-rack conversion kit to switch the tower server to rack mode operation. After the kit is installed, complete in-rack serviceability for all server components is supported.
Procedure
  1. Review the rack warnings and cautions.
  2. If the server is currently used in tower mode, prepare the server for rack installation.
  3. Install the rack rails and server tray.
  4. Install the server into the rack.
  5. Power up the server.
  6. Enable the increased cooling function.