Installing an SFF hot-plug drive

CAUTION:

To prevent improper cooling and thermal damage, do not operate the rack unless all device bays are populated with either a component or a blank.

Prerequisites
Before you perform this procedure:
Procedure
  1. Open the front bezel.
  2. Remove the drive blank.

    Removing the SFF drive blank
  3. Prepare the drive.

    Preparing the SFF drive for installation
  4. Install the SFF drive.

    Installing the SFF drive
  5. If a hot-plug drive is installed into an empty backplane after the initial boot, reboot the system to get optimal ventilation.
  6. Determine the status of the drive from the drive LED definitions.
  7. Close the front bezel.

The installation is complete.

To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise website.