Preparing the system for operation

Procedure
  1. Install any options or cables previously removed to access the TPM connector.
  2. Install the access panel.
  3. Do one of the following:
    • Slide or install the server into the rack.

    • Install the system into the rack.

  4. Power up the system.
    1. Connect the power cords (rack and tower servers).
    2. Press the Power On/Standby button.