Compute module does not power on with the Multi-MXM expansion module installed
The expansion module LED does not illuminate.
Mezzanine connector 1 and mezzanine connector 2 are shown as empty in HPE OneView and the iLO Device Inventory.
The IML displays one of the following messages:
Power On Denied (Service Information: Mezz Slot #, Read Error)
Server Critical Fault (Service Information: Power On Fault, MEZZ Cards, MEZZ 2 (01h)) Mezzanine
Server Blade Enclosure Inadequate Power To Power On: Not Enough Power
The mezzanine pass-through is not installed on mezzanine connector 1 or on mezzanine connectors 1 and 2.
- The mezzanine pass-through is not properly seated on the mezzanine connector.
- Switch 9 on the System Maintenance Switch on the compute module is not set in the ON position.